● LOONIE PAPER
Overview Performance Interpreter Conformance News Divergence Sessions & Regimes Failures Costs Tear-sheets Backtest

Backtest Lab — locked production strategy · core pairs 2002–2026 · 2026 additions 2020–2026

This lab runs the RETIRED CORE6-era spec for research comparison. It does not test the current evolved system (agent worker + learning layer + HS60_75); the evolved stack's backtest is the track-record card's walk-forward study.
Select instruments, then run. Everything else is fixed.
Strategy locked to the retired CORE6-era spec — parameters not adjustable. Spec read from the retired CORE6 config on every run · 12h max hold · 0.20%/trade · 1.50% open-risk cap · 99%-of-peak ratchet floor · V3 drift trail (arm −0.40R, close-all −0.90R) · 1-loss 30-min cooldown · ML gate (R4 v2.1 model) · FCFS allocation.
running…